Our Commitment

Quality Built Into
Every Connection

In instrumentation systems, a single leaking fitting can stop a plant. That is why quality at Pipe-Lok Vales & Fittings is not a final check. It is part of every step, from the raw material we accept to the way each piece is packed.

"Pipe-Lok Vales & Fittings is committed to supplying instrumentation fittings, filters and valves that meet customer specifications and applicable industry standards, delivered on time. We achieve this through verified materials, controlled manufacturing, complete testing and full traceability, and we continually improve our processes based on customer feedback."

Management, Pipe-Lok Vales & Fittings

Quality Objectives

What We Hold Ourselves To

Verified Material

Only raw material with valid mill test certificates and matching heat numbers enters production.

Leak-Free Performance

Every pressure-containing product is pressure tested before dispatch.

Full Traceability

Heat number, grade and size marking links each piece back to its material certificate.

On-Time Delivery

Planned production and ready stock of standard sizes to meet committed delivery dates.

Quality Control Process

From Raw Material to Dispatch

Raw Material Inspection

Bar stock and forgings are checked against their mill test certificates for grade, heat number and dimensions before release to the shop floor.

In-Process Inspection

Critical dimensions, threads and sealing surfaces are inspected during machining with calibrated gauges and instruments.

Surface Finishing

Components are cleaned, deburred and finished (passivated, electropolished or polished as specified) for corrosion resistance and clean service.

Pressure Testing

Valves, filters and assemblies are 100% pressure tested per API 598, with designs following ASME B31.3 process piping requirements.

Marking & Traceability

Each product carries the Pipe-Lok Vales & Fittings logo, material grade, size, connection and heat number for complete traceability.

Final Inspection & Packing

A final visual and dimensional check, then protective packing with end caps (and cleanroom packing for UHP face seal fittings).

Documentation

Certificates Supplied
With Your Order

Every order can be supported with the documents your inspection team or end client needs for approval.

  • Material Test Certificate (MTC) as per EN 10204 3.1
  • Heat number marked on every piece
  • Pressure test reports
  • Dimensional drawings and datasheets on request
  • Third-party inspection support on request

Need certified instrumentation products?

Share your specification and we will confirm materials, testing and documentation.

Request a Quote
Go Back Top